Utility-scale power,
deployed in months — not years.
Grid interconnection queues now run five to seven years. Data centres can't wait that long. KW PowerLogic sources gas turbines and generation packages and gets them behind your meter fast — bridging, prime, or off-grid.
Aeroderivative, industrial & heavy-frame · 800 kW to 289 MW · gas, dual-fuel & diesel · new, 0-hour & refurbished
The grid is the bottleneck. Turbines aren't.
Hyperscale and colocation loads are landing faster than utilities can energize them. On-site gas turbines close the gap — carrying the campus until grid capacity arrives, or standing in as the permanent source.
Queue-to-energization for new large loads in most North American markets — before a single rack powers on.
Typical mobilization for a fast-track mobile turbine package from award to first power on site.
Available now & on offer
Live and near-term availability across mobile aeroderivative units, frame turbines, and balance-of-plant. Specifications are indicative — request the full data sheet and current status for any unit.
- FuelDual · gas / distillate
- ConditionNew · 0 fired hrs · in-crate
- Config50 Hz · V8 · H₂-ready
- AvailabilityImmediate · Europe
- FuelNatural gas · DLN
- Condition0-hour refurb · rare
- Qty2 units
- AvailabilityImmediate
- FuelNatural gas
- ConditionNew units
- Qty2 units · 45.6 MW
- AvailabilityImmediate
- FuelNatural gas
- ConfigSkid · trailer optional
- Qty17 units · 253 MW
- AvailabilityReady
- FuelNatural gas
- ConfigTrailer-mounted mobile
- Qty20 units · 330 MW
- AvailabilityReady
- FuelNatural gas
- Condition0-hour · new pkg · trailer
- Qty4 units · 61.6 MW
- AvailabilityReady
- FuelDual · gas / distillate
- Config13.8 kV · PLC controls
- Qty1 unit
- Availability4–6 weeks
- FuelNatural gas · dual-capable
- ConfigContainerized · stackable
- Qty50 units · 75 MW
- AvailabilityAvailable · Europe
- FuelDiesel
- Config11.2 kV · 60 Hz
- Qty8 units · 36.8 MW
- AvailabilityAvailable · ex-works
- FuelNatural gas
- ConfigGT gen. pkg · aux skids
- Qty4 units · output on req.
- AvailabilityAvailable now
- FuelNatural gas
- Condition0-hour · overhaul in prog.
- Qty4 units · 168 MW
- AvailabilityOct 2026
- FuelNatural gas · DLE
- ConditionOverhauled · new packages
- Qty2 units · 62 MW
- AvailabilityQ1 2027
- FuelNatural gas
- Condition0-hr refurb · 13.8 kV · 1-yr wty
- Qty9 units · divisible
- AvailabilityQ1–Q2 2027
- FuelNatural gas · SoLoNOx
- Config130S TM · single-shaft
- Qty7 units · 108 MW
- AvailabilityQ2–Q4 2027
- FuelDual fuel
- ConditionNew · dual arrangement
- Qty4 units · 37 MW
- Availability2026–2027 · Europe
- FuelNatural gas
- ConfigSkid-mounted
- Qty2 units · 22.6 MW
- AvailabilityQ4 2026
- FuelNatural gas
- ConfigSkid-mounted
- Qty2 units · 18.9 MW
- Availability10–12 mo. from PO
- FuelNatural gas
- Condition0-hour refurb proposal
- Qty10 units · 400 MW
- AvailabilityOn request · 2026–27
- FuelNatural gas
- ConfigHeavy-duty GT gensets
- Qty4 units · 196 MW
- AvailabilityAhead of decommission
- FuelNatural gas
- ConditionRefurb · 1,100 hrs TSN
- Qty1 unit
- AvailabilityHrs verification on req.
- FuelNatural gas
- ConfigStationary / trailer · TBD
- Qty10 units · phased
- Availability2027 · LOI + deposit
- FuelNatural gas
- ConfigSkid · sound-attenuated
- QtyPhased · 400+ MW total
- Availability2027 / 2028 phased
- HoursUnder 300
- AlternatorStamford 800 kW · 600 V
- FormatEnclosed trailer
- AvailabilityAvailable
- SwitchgearParallel / closed / open
- TransformersNew & refurb
- UPSVirtual closed-transition
- Load banksRental
- FuelNatural gas
- Condition0-hour refurbished
- Qty2 units · 88 MW
- StatusTransacted 2026
- FuelNatural gas
- ConditionOverhauled · new packages
- Qty10 units · 240 MW
- StatusTransacted 2026
- FuelDual · gas / liquid
- ConditionBrand new · mobile / trailer
- Qty10 units · 348 MW
- StatusTransacted 2026
Sourcing is where we start. We take it to first power.
A single desk across procurement, engineering, install, and long-term operation — so the turbine you buy actually runs when your load lands.
Procurement
New, low-hour and refurbished turbines and gensets sourced across the global market — prime-rated units at standby prices, warranty available.
Engineering
Electrical, mechanical, civil, structural and environmental design — load-profile analysis, layout, fuel and grid interconnection, emissions and sound attenuation.
Installation
Full scope-of-work and price competition across install teams, analyzed and awarded for the best fit per project.
Operations & maintenance
Long-term service contracts that keep units running efficiently, 24/7, without downtime.
Balance of plant
Switchgear, step-up transformers, UPS and load banks — sourced and integrated so the package is complete, not just the prime mover.
GA mitigation desk
For Ontario Class A loads: peak-alert service and dispatch strategy to cut the Global Adjustment charge — often the largest line on the bill.
Own it, lease it, or just buy the power.
Structures that let the generation pay for itself — so capital isn't the reason your campus waits on the grid.
Deferred-payment lease
Optional terms with payments delayed until savings or revenue are realized — keep the capital on the buildout.
Third-party owned
A third party owns and operates the generation and shares the savings over a set term. No capex, no operating burden.
Power purchase agreement
Buy electricity at a fixed rate below current market for a defined term — behind the meter, on your site.
Two decades in Ontario power — now scaled for the data centre era.
KW PowerLogic has worked in the generation and renewable market since 2002, from distributed connections to utility-scale turbine transactions.
Tell us your load and your date.
Send the target capacity, fuel, site and when you need first power. We'll come back with what's available and the path to energization.